Industry

Durst Group Installs One of the Biggest Solar Panel Plants in South Tyrol

by FESPA Staff | 17/05/2023
Durst Group Installs One of the Biggest Solar Panel Plants in South Tyrol

Durst Group, the leading manufacturer of advanced digital printing and production technologies, announced today the installation of a state-of-the-art solar panel plant at its headquarters in Brixen, South Tyrol.

This initiative is part of the company's ongoing sustainability efforts and commitment to reducing its carbon footprint. The new solar panel plant, one of the biggest in South Tyrol, has a capacity of 1,569 KWp / 1.57 MWp and is expected to generate over 1,700,000 KWh / 1,700 MWh of energy annually. This corresponds approximately to the electricity demand of 550 single-family households and more than 50% of the energy demand of Durst Brixen. The installation consists of 3,410 modules, two separate plants, and 14 inverters.

Brixen, Italy –May 15, 2023 - Durst Group, the leading manufacturer of advanced digital printing and production technologies, announced today the installation of a state-of-the-art solar panel plant at its headquarters in Brixen, South Tyrol. This initiative is part of the company's ongoing sustainability efforts and commitment to reducing its carbon footprint. The new solar panel plant, one of the biggest in South Tyrol, has a capacity of 1,569 KWp / 1.57 MWp and is expected to generate over 1,700,000 KWh / 1,700 MWh of energy annually. This corresponds approximately to the electricity demand of 550 single-family households and more than 50% of the energy demand of Durst Brixen. The installation consists of 3,410 modules, two separate plants, and 14 inverters. 

Following our installation of a solar panel plant at our production site in Lienz/Austria in 2022, we are thrilled to have installed now one of the biggest solar panel plants in South Tyrol at our headquarters in Brixen," said Christoph Gamper, CEO of Durst Group. "Our commitment to sustainability is a core value at Durst, and this new installation is a testament to that commitment. We are proud to take this important step towards reducing our carbon footprint and making a positive impact on the environment.

The plant will produce 70% of the generated energy for direct self-consumption, while the remaining 30% will be available for feed-in or future storage solution. The technology used includes power optimizers by Solaredge that maintain the performance of a series of modules even in the presence of partial shading or pollution. 

The project, which was executed by Leitner Electro, took six months to complete, including a winter/bad weather break. Stadtwerke Brixen provided friendly support for the project. 

Durst. Advanced Digital Printing and Production Technology 

Durst is a world-leading manufacturer of advanced digital printing and production technologies. The company operates in more than 100 countries worldwide and has over 1.000 employees. Durst is committed to sustainability and has implemented a range of initiatives to reduce its environmental impact. For more information, visit www.durst-group.com
 

by FESPA Staff Back to News

Interested in joining our community?

Enquire today about joining your local FESPA Association or FESPA Direct

Enquire Today

Recent news

How does it work: from file to ink droplet
Features

How does it work: from file to ink droplet

Sonja Angerer describes the process of how customers send files to printers for output.

07-12-2023
How to design products for a Circular Economy
Podcasts

How to design products for a Circular Economy

In this podcast we speak to Sam Taylor from De Ronde Creative Hub about designing products for a circular economy, how to engineer the maximum reuse of raw materials, consumerism in fast fashion and the use of AI regarding the future of sustainability and much more.

07-12-2023
The latest trends and opportunities in creative and smart sportswear
Features

The latest trends and opportunities in creative and smart sportswear

James Gatica discusses the latest trends in creative and smart sportswear and the available opportunities for printers.

06-12-2023
FESPA Brasil 2024 surpasses 90% occupancy in exhibition area
Press Releases

FESPA Brasil 2024 surpasses 90% occupancy in exhibition area

FESPA and APS events are proud to announce FESPA Brasil 2024 will return to São Paulo, Brasil from 11th – 14th March 2024. The exhibition will take place at the Blue Pavilion of Expo Center Norte and the exhibition area has already reached 92% capacity in merely 3 months.

06-12-2023